Forge fabrication bay interior — overhead cranes receding into perspective, structural steel stacked along walls, CNC plasma table in foreground with sparks
Est. 1987 · Portland, OR · 200,000 SF Facility

1.4M tonsfabricated.Zero liquidateddamages.

Structural steel, precast panels, custom assemblies. Three shifts. One facility. The fabrication partner that won't blow your critical path.

Scroll
CAPACITY
01 — Capacity

The floor never stops.
Neither does your schedule.

200KSF
Facility Floor Area
Under one roof, Portland OR
3Shifts
Daily Production Shifts
24-hour operational capacity
18Days
Average Turnaround
Standard structural package
47Tons/Day
Peak Daily Output
Q3 2025 production record
Live Shop Availability

Updated hourly from production board — May 29, 2026

Structural Steel
87% loaded13% available
Precast Panels
62% loaded38% available
Custom Assemblies
74% loaded26% available
Welding Bays
91% loaded9% available
02 — Capabilities

What we run.
What we certify.

Six active certifications. Forty-seven welding positions. Every process in-house — no subcontracting the work that defines your schedule.

Forge welding operations — certified welder working on structural steel assembly in fabrication bay
47
Certified Welding Positions
AWS D1.1 · D1.5 · D1.8 qualified
Active Certifications
AWS D1.1Structural Welding — Steel
Cert. 2019
AISC 303Code of Standard Practice
Cert. 2021
ISO 9001Quality Management System
Cert. 2022
SSPC SP-6Commercial Blast Cleaning
Cert. 2020
NSBANational Steel Bridge Alliance
Cert. 2018
PCI MNL-116Precast Concrete QC
Cert. 2023
Equipment Inventory
4
CNC Plasma Tables
6×24 ft cutting envelope
12
Overhead Cranes
5–50 ton capacity
38
Welding Stations
GMAW / FCAW / SMAW
2
Shot Blast Chambers
Full beam capacity
3
CNC Drill Lines
Automated beam processing
5
Paint/Coating Bays
SSPC SP-6 compliant
What We Fabricate
Structural Steel Packages
Precast Concrete Panels
Custom Weld Assemblies
Moment Frame Systems
Stair & Railing Systems
Miscellaneous Metals
Max Single-Project Tonnage
8,400tons
Delivered for Pacific Gateway logistics hub, 2024
03 — Track Record

The numbers don't
need footnotes.

312 structural packages. Not one delay claim. These are the metrics procurement directors pull in qualification questionnaires.

99.2%
On-Time Delivery Rate
36-Month Rolling
0
Liquidated Damages Events
Company History
312
Projects Completed
Since 2018
72 hrs
Average Quote Turnaround
Binding + Schedule

Forge delivered a 340-ton moment frame package in 16 days. We had three other subs telling us 6 weeks. That's the difference between making a pour date and blowing it.

Derek Callahan
Senior PM, Hensel Phelps
340T Moment Frame · Portland, OR

We've run four projects with Forge. Not one liquidated damages event. Not one RFI that came back without a drawing revision attached. They speak contractor.

Maria Santos
Procurement Director, PCL Construction
4 Projects · $12M Fabrication Value

Forge delivered a 340-ton moment frame package in 16 days. We had three other subs telling us 6 weeks. That's the difference between making a pour date and blowing it.

Derek Callahan
Senior PM, Hensel Phelps
340T Moment Frame · Portland, OR

We've run four projects with Forge. Not one liquidated damages event. Not one RFI that came back without a drawing revision attached. They speak contractor.

Maria Santos
Procurement Director, PCL Construction
4 Projects · $12M Fabrication Value

The shop drawings came back stamped in 72 hours. Every other shop I've used takes two weeks. That time is real money on a fast-track job.

James Okafor
Project Executive, Turner Construction
Precast Panel Package · Seattle, WA

When our GC tried to value-engineer us into a cheaper shop, we pushed back. Forge's track record is the insurance policy. You don't swap that out for a $40K savings.

Priya Mehta
Developer PM, Greystar Development
Mixed-Use Structural Package

The shop drawings came back stamped in 72 hours. Every other shop I've used takes two weeks. That time is real money on a fast-track job.

James Okafor
Project Executive, Turner Construction
Precast Panel Package · Seattle, WA

When our GC tried to value-engineer us into a cheaper shop, we pushed back. Forge's track record is the insurance policy. You don't swap that out for a $40K savings.

Priya Mehta
Developer PM, Greystar Development
Mixed-Use Structural Package
04 — Logistics

Fabrication that fits
your critical path.

We coordinate around your erection sequence, not our convenience. Phased delivery, piece-mark tracking, and no surprises.

6
Simultaneous Projects
Max active at any time
850mi
Delivery Radius
Direct-haul, no transfer
48 hrs
Staging Lead Time
Pre-load to first truck
100%
BIM-Ready Output
Revit, Tekla, SDS/2
Phased Delivery Scheduling
We sequence fabrication to match your erection schedule — not our production convenience. Pieces ship in bolt-on order.
Real-Time Production Tracking
GCs get a live dashboard showing fabrication status by piece mark — no chasing shop status calls on a Friday afternoon.
IFC Drawing Review Included
Every package includes a pre-fabrication constructability review. We catch conflicts before they become field RFIs.
72-Hour Quote Commitment
Binding price and preliminary production schedule returned within 72 hours of receiving IFC drawings. No exceptions.
Structural steel beams being loaded onto flatbed truck for jobsite delivery — Forge logistics operation
850
Mile delivery radius
Direct haul — no transfer terminals
14
States served
05 — Partner

The vetting is done.
Start the conversation.

Every metric a qualification questionnaire asks for is already on this page. Submit your project details and get a binding quote within 72 hours.

Request Shop Capacity
Binding quote + schedule in 72 hours
Shop Open
1
Project Scope
2
Timeline
3
Contact
250 tons
10T2,500T5,000T10,000T
Download Capabilities Deck
PDF · 24 pages · Updated Feb 2026

Full equipment list, certification documentation, project portfolio, and qualification package in one PDF.

72 hrs
Binding quote + preliminary schedule
0
Liquidated damages in company history
99.2%
On-time delivery, last 36 months
Prefer to call?
(503) 555-0190
Mon–Fri 6AM–6PM PT · Ask for Estimating